Categories
- Commercial LED Lighting-> (35)
- Flexible LED Strip-> (50)
- LED Bathroom Lights-> (56)
- LED Bulkheads-> (72)
- LED Ceiling Lights (9)
- LED Desk Lamps (8)
- LED Display Lights (7)
- LED Downlights-> (119)
- LED Drivers-> (45)
- LED Emergency Lighting-> (109)
- |_ Emergency Lighting Batteries (30)
- |_ LED Emergency Bulkheads (14)
- |_ LED Emergency Conversion Kits (13)
- |_ LED Emergency Downlighters (12)
- |_ LED Emergency Exit Signs (19)
- |_ LED Emergency Track Fittings (3)
- |_ LED Emergency Twin Spots (18)
- LED Floodlights (50)
- LED Floor Lights (8)
- LED Garden Lighting-> (210)
- LED Kitchen Lights-> (16)
- LED Lamps-> (177)
- LED Panels-> (49)
- LED Picture Lights (13)
- LED Site Lighting Equipment-> (13)
- LED Solar Lights-> (3)
- LED Stage Lighting (16)
- LED Street Lights-> (10)
- LED Track Fittings (34)
- LED Tubes-> (15)
- LED Wall Lights-> (126)
- Specials ...
- New Products ...
- Featured Products ...
- All Products ...
Featured [more]

Citronic Matrix Pro, 10 x 10 Matrix Light
Price:£190.80   Inc Vat:£228.96

Citronic Matrix Bar Pro, 20 x 2 Matrix Light With Stand
Price:£165.80   Inc Vat:£198.96
Important Links
Sponsors
New Products [more]

Red Arrow ORB12-CCT 12W Orbit Recessed Circular LED Downlight CCT Switchable
Price:£19.76   Inc Vat:£23.71

230V 8W BC LED GLS Lamp In Cool White B22 805 Lumens 4000K
Price:£6.72   Inc Vat:£8.06

Lloytron LY9518 35W Desk Lamp In An English Mustard Colour
Price:£14.02   Inc Vat:£16.82
Bestsellers
- Channel Safety 4.8V 850mAh NiMh...
- Channel Safety 3.6V 2600mAh NiMh...
- Channel Safety B/BATT/GL/1W 3.6V...
- Channel Safety Replacement 4.8V...
- 2.4V 1800mAh NiMh New Style Long...
- Channel Safety Grove Twinspot 12V...
- Channel Safety B/BATT/GL/5W 3.6V...
- Yuasa 2DH4-0L3 2.4V 4Ah 2 x D Cell...
- Channel Safety Camber 3.6V NiCd AA...
- Channel Safety Grove Twinspot 9.6V...
Copyright © 2026 Discount LED Lighting T/A: Innovate Electrical Supplies Ltd.


